What is a Commissioning Checklist?

A commissioning checklist is used to easily perform comprehensive installation, functional, and operational inspections of a project equipment, system, or components. This checklist helps resolve any detected failures and ensure full functionality of project assets.

How does a commissioning checklist improve project safety and performance?

Using a commissioning checklist enhances project safety and performance by confirming that HVAC systems are properly installed, operate efficiently, and are compliant with design requirements. This comprehensive check helps prevent equipment failures and safety risks by properly recording the system’s condition and also allowing users to fine-tune controls for functional performance.

At What Point Does Pre-commissioning End and Commissioning Begin?

There are regional differences when it comes to common parlance in pre-commissioning and commissioning. Pre-commissioning is sometimes referred to as Cold Commissioning, Static Commissioning, or Mechanical Completion; on the other hand, commissioning is sometimes referred to as Hot Commissioning, Live/Dynamic Commissioning, or Start-up. Therefore, commissioning teams experience difficulty in determining the proper procedure. Here is a run-down of what needs to be done during pre-commissioning and commissioning, respectively:

Pre-commissioning Procedure

  1. Piping and Instrumentation Diagram (P&ID) Check, also known as System Check or Walkdown, should be performed by the commissioning team to identify engineering and construction errors. Create a P&ID Punch List and address identified issues before pre-commissioning.

  2. Pre-commissioning activities start from mechanical completion, where running-in of equipment such as control system sequence tests (Dry Commissioning), water or solvent introduction to closed-loop pumps (Wet Commissioning), and other operating scenarios where process fluids are NOT YET used.

The Defining Point: Pre-Startup Safety Review (PSSR)

PSSR is a thorough safety inspection of a new or modified facility to be conducted before commissioning. This is the point where pre-commissioning ends and commissioning begins. Correct any system failure, resolve all safety risks, and re-take the PSSR to comply with health and safety regulations prior to commissioning.

Commissioning Procedure

  1. Commissioning is the overall performance testing of the facility and its systems such as HVAC, pumps, piping, and lighting. Outstanding punch points should be resolved before routine operation. During a manufacturing plant commissioning, process conditions are established and process fluids (the actual raw materials to be used for routine production) are introduced into the system.

  2. Initial Operation, or the first production run, aims to determine if the production process manufactures output that meets design requirements. Easily identify non-conformance and adjust the system or optimize the process by performing a first article inspection prior to routine production.

What is Included in a Commissioning Checklist

A commissioning checklist is an essential tool used in various industries to ensure that systems, equipment, and processes are installed and functioning as intended. The contents of a commissioning checklist can vary based on the project type and assets involved, but typically include several key elements:

  1. Pre-Installation Checks: Verify design, equipment, and site conditions.

  2. Installation Verification: Ensure proper installation and secure connections.

  3. System Testing: Test functionality, safety systems, and performance.

  4. Adjustments and Calibration (TAB): Balance and calibrate systems for optimal performance.

  5. Documentation and Compliance: Ensure proper documentation and regulatory compliance.

  6. Training and Handover: Train staff and provide operational resources.

  7. Post-Commissioning Follow-Up: Address any outstanding issues and schedule follow-ups.

Commissioning Checklist PDF Report

Preview Commissioning Checklist PDF Report

[testimonial props="[{'logo':{'logo':{'altText':'','mediaDetails':{'height':100,'width':64},'mediaItemUrl':'https:\/\/wp-website.safetyculture.com\/wp-content\/uploads\/sites\/3\/2025\/07\/Manitou-group.svg'},'height':null}},{'editor':'<p>Manitou Group found SafetyCulture&#8217;s digital solution useful in multiple departments located in their headquarters in Ancenis, from production and logistics to internal audits. They have streamlined data tracking and follow-up processes, replacing the days of manual archive searches.<\/p>\n'},{'image':{'altText':'','mediaDetails':{'height':1136,'width':1198},'mediaItemUrl':'https:\/\/wp-website.safetyculture.com\/wp-content\/uploads\/sites\/3\/2025\/07\/testimonial-manitou.png'}},{'link':{'title':'Read success story','url':'https:\/\/safetyculture.com\/customers\/manitou-group\/','style':'primary'}}]"]

FAQs About Commissioning

JT

Article by

Jona Tarlengco

SafetyCulture Content Specialist

View author profile

Related resources you might like

Powered by

Pre-commissioning Checklist

A pre-commissioning checklist aims to prepare a manufacturing plant for start-up, or when all new or modified systems are going live. Use this checklist to easily inspect control systems, wiring, sensors, field control devices, and the site communications network. Identify non-compliance, address systemic issues, and lessen start-up problems with this pre-commissioning checklist.

Powered by

Plant Commissioning Checklist

This plant commissioning checklist is used for the commissioning of wastewater projects or treatment plants. This checklist has been designed to make it easier for inspectors to verify the installation, function, and documentation of pumping systems and the preliminary, secondary, and tertiary treatment process equipment.

Powered by

Electrical Commissioning Checklist

This electrical commissioning checklist is used for the commissioning of low voltage installations in a building. Use this checklist to verify the compliance of the switchboard, main switch and circuit breaker, distribution board, and final circuits with client specifications.

Powered by

Equipment Commissioning Checklist

This equipment commissioning checklist is used for the commissioning of burners/boilers in an industrial or commercial power plant. Each inspection item can also be set to “mandatory” to make sure that every detail about the equipment commissioning is checked.

Powered by

Project Commissioning Checklist

This project commissioning checklist can be used by commissioning teams during the planning, designing, construction, and post-construction phases of a project to achieve desired outcomes. This checklist includes valuable elements and success factors of project commissioning such as assisting the owner (client) evaluate the facility’s requirements, backchecking mid-construction documents, and more.

Powered by

Building Commissioning Checklist

A building commissioning checklist aims to assess the HVAC, electrical, plumbing, and building envelope systems and perform retro-commissioning as needed. Use this checklist to determine if the efficiency of existing equipment and systems of a building should be improved and create corrective actions that send and receive real-time notifications when complete, in progress, or still to do.

Articles

Vendor Risk Management Software

Discover the 10 best vendor risk management software and efficiently manage potential threats associated with vendors with your top pick.

Lone Working in Healthcare: The Ultimate Guide

Learn more about lone working in healthcare, its importance and regulations on how to keep lone workers safe.

Contractor Safety Checklist

Use this contractor safety checklist to enhance management strategies on a construction site and address common hazards.